You know "done". This is done with proof attached.

Six things must be true before Engineering calls a change finished.

A change is not finished when the code compiles. It is finished when six things are true, and each one can be checked by someone who was not there.

  • Standard
  • Engineering
  • Every task
01 · The checklist

Six things that must be true

  1. Acceptance criteria shown. Test output, a screenshot at the right screen widths, or a run log.
  2. Targeted tests, then one full run. Small tests while building, one complete run at the end, and it must be green.
  3. Self review. Every line of the diff read as a reviewer would, before anyone else is asked.
  4. Security pass. No secrets in the code, nothing unchecked from outside.
  5. Committed locally. Only its own files, one concern per commit.
  6. Notes updated. The owning project's notes and map reflect the change.
02 · Then, and only then

Shared only after a yes

Done does not mean published. The change stays on the machine until you say yes to sharing it. A finished change and a shared change are two separate steps, on purpose.

03 · Honest reporting

What failed is reported too

If a test fails or a step was skipped, the report says so plainly. A short honest report beats a long confident one.